Integrated cost and schedule control for construction projects / Frederick Wm. Mueller.
By: Mueller, Frederick William.
Material type:
Item type | Current location | Call number | Copy number | Status | Date due | Barcode | Item holds |
---|---|---|---|---|---|---|---|
![]() |
Central Library, KUET General Stacks | 692.5 MUE (Browse shelf) | 1 | Available | 3010013136 |
Total holds: 0
Includes index.
There are no comments for this item.