000 | 00875nam a22002177a 4500 | ||
---|---|---|---|
003 | BD-KhUET | ||
005 | 20121119220508.0 | ||
008 | 120716r19881982ii ||||| |||| 00| 0 eng d | ||
040 |
_aBD-KhUET _cBD-KhUET |
||
082 |
_219 _a658.4032 |
||
100 | 1 |
_aPunmia, B. C. _95676 |
|
245 |
_aProject planning and control with PERT and CPM / _cby B. C. Punmia, K. K. Khandelwal. |
||
250 | _a3rd ed. | ||
260 |
_aNew Delhi; _bLaxmi Pub., _c1982,[Reprinted 1988]. |
||
300 |
_avii, 231 p. : _bill. ; _c21 cm. |
||
650 |
_aProject management. Critical path analysis. PERT (Network analysis) _95677 |
||
700 | 1 |
_aKhandelwal, K. K. _95678 |
|
942 |
_2ddc _cBK |
||
999 |
_c6226 _d6226 |
||
952 |
_w2012-07-16 _p3010015998 _r2012-11-19 _40 _eIdeal Library _00 _bKUETCL _10 _o658.4032 PUN _d1991-06-18 _q2013-06-18 _t1 _70 _cGEN _2ddc _g83.20 _yBK _s2012-11-19 _l1 _aKUETCL |